Network Alterations

Network AlterationsWe may need to make alterations to the electricity system. For example:

Building Work

Building work is proposed which requires cables, overhead lines, substations or meters to be moved.

Additional Equipment and Loads

Additional electrical equipment is to be connected which increases the load.

Additional Equipment and Disturbances

Additional electrical equipment is to be connected which could create a disturbance on the electricity system, ie connecting a motor or welder.

If there is any possibility that Network Alterations are required then please contact:-

In East Midlands

Records Team
Western Power Distribution
Herald Way
Pegasus Business Park
Castle Donington
DE74 2TU

Tel  0845 072 7270
Fax  0115 876 7458

In West Midlands

Records Team
Western Power Distribution
Toll End Road
Tipton
DY4 0HH

Tel  0845 072 7270
Fax  0115 876 7458

In South Wales

Records Team
Western Power Distribution
Phoenix Way
Llansamlet
Swansea
SA7 9HW

Tel  0845 6013341
Fax  01792 784510
Email  wpdnewsupplieswales@westernpower.co.uk

In South West

Records Team
Western Power Distribution
Lostwithiel Road
Bodmin
PL31 1DE

Tel 0845 601 2989
Fax 01208 892292
email wpdnewsupplies@westernpower.co.uk

Please see our Connections  page for further information.