In order to provide complete functionality this website needs your consent to store browser cookies. If you don't allow cookies, you may not be able to use certain features of the website including,but not limited to log in, order services, see personalised content or switch between languages. It is recommended that you allow cookies. More information

Design Standards

Please use the categories below to help you find the correct information:

Unmetered
Streetlighting
Low Voltage
11,000 Volt
33,000 Volt
66,000 Volt
​132,000 Volt

SD5P/3

19/04/2018

Design of Unmetered Connections.
 

Download File

WPD G81 Part 1

12/12/2012

Housing Development Design framework.

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.
 

Download File

CAØB/1

13/12/2012

Procedures for Changing Domestic 100A Cut-Outs with the Incoming LV Service Cale Live.

Download File

CAØM/4

11/02/2016

Procedures for Making LV Service Cable Branch Joints.
 

Download File

CAØN/2

09/10/2014

Procedures for Making LV Service Cable Stop Ends.
 

Download File

CAØU/2

09/10/2014

Procedures for Making LV Service Cable Cut-Out Terminations.
 

Download File

CAØV/2

09/10/2014

Procedures for Making LV Service Cable Straight Joints.

Download File

CAØW/1

12/12/2012

Procedures for Changing Street Lighting Cut-Outs with the Incoming LV Service Cable Live.
 

Download File

SD5P/3

19/04/2018

Design of Unmetered Connections.

Download File

WPD G81 Part 1

12/12/2012

Housing Development Design framework.

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.
 

Download File

CA1AB/1

12/12/2012

Procedures for Making Low Voltage Mains Three Core Wavecon Connection/Disconnection Joints.

Download File

CA1C/8

03/02/2017

General Requirements Low Voltage Mains Jointing.
 

Download File

CA1D/4

21/12/2012

Procedures for Making Low Voltage Mains Cable Straight Joints.
 

Download File

CA1E/4

09/07/2013

Procedures for Making Low Voltage Mains Cable Branch Joints.

Download File

CA1F/3

12/12/2012

Procedures for Making Low Voltage Mains Cable Stop Ends.

Download File

CA1G/6

08/07/2014

Procedures for Making Low Voltage Mains Cable Terminations.

Download File

CA1H/6

27/08/2014

Procedures for Making Low Voltage Mains Cable Disconnecting Boxes.

Download File

CA1I/4

12/12/2012

Procedures for Making Low Voltage Mains Cable Service Branch Joints.

Download File

CA1U/2

12/12/2012

Jointing of Paper Insulated Concentric and Triple Concentric Mains Cable.
 

Download File

CA1Y/1

12/12/2012

Procedures for Making Low Voltage Mains Cable Loop Joints.

Download File

WPD G81 3 Part 2

12/12/2012

Housing Development Installation and Records framework.
 

Download File

MI14D

13/12/2012

Earth Loop Impedance Testing of Services.
 

Download File

SD5A/3

19/01/2018

Design of Low Voltage Domestic Connections.
 

Download File

SD5C/2

11/05/2016

Low Voltage Connections to Multiple Occupancy Buildings.
 

Download File

SD5D/2

27/06/2013

Arrangements for LV Cut-Outs.

Download File

SD5R/2

19/01/2018

Earth Fault Loop Impedances and Phase to Neutral Loop Impedances at LV Installations.
 

Download File

TP21D/2

21/10/2015

11kV, 6.6kV and LV Earthing.

Download File

WPD G81 Part 1

12/12/2012

Housing Development Design framework.
 

Download File

NC2D/2

05/03/2014

Specification of Connection Assets.

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.
 

Download File

SD5/4

25/02/2015

LV System Design.

Download File

EE132

28/08/2015

Earthing Materials and Associated Sundry Items.

Download File

SD5B

17/09/2015

Low Voltage Connections with Minimal Network Analysis.

Download File

SD5K/6

19/04/2018

Use of WinDebut Software.

Download File

SD1F/2

03/06/2016

Competition in Connections Code of Practice (COP) - Procedure for network analysis by Independent Connection Providers (ICPs).

 

Download File

SD1F/2 + Audit Form

03/06/2016

SD1F/2 - Point of Connection & Contestable Design Audit Form (hyperlinked to SD1F/2 - page 10).

Download File

SD7A/7

19/04/2018

Data Sets Used with Windebut Software.
 

Download File

SD6J

08/04/2016

Connection design - potentially disturbing electrical equipment rated less than or equal to 75A / phase subject to conditional connection.

Download File

SD1E/3

19/01/2018

Technical Requirements for Customer Export Limiting Schemes.

Download File

SD5E/1

14/08/2017

Design of Low Voltage Commercial and Industrial Connections.

Download File

SD5E/1 + Calculation Spreadsheet

21/04/2017

SD5E/1 - Calculation Spreadsheet (hyperlinked to SD5E/1 - pages 13, 15 & 35).

Download File

SD1H/1

17/05/2017

The Treatment of Losses in an Inclusive Network Design Process.

Download File

WPD G81 Part 4

28/04/2016

Framework for Design and Planning of Industrial and Commercial Underground Connected Loads up to and including 11kV.
 

Download File

SD4/7

15/07/2015

11kV and 6.6kV System Design.
 

Download File

SD4O/1

14/10/2015

Standard HV Connection Arrangements.

Download File

TP4B/2

23/01/2014

11kV and 6.6kV Transformer Protection.

Download File

WPD G81 Part 1

12/12/2012

Housing Development Design framework.

Download File

NC2D/2

05/03/2014

Specification of Connection Assets.

Download File

CA2A/2

08/06/2016

Jointing Configurations for 11kV Cables.

Download File

CA2C/9

19/01/2018

General Requirements for 11kV Cable Jointing.
 

Download File

CA2M/4

08/06/2016

Procedures for Making 11kV Cable Branch Joints.
 

Download File

CA2N/6

19/01/2018

Procedures for Making 11kV Cable Stop Ends.

Download File

CA2O/4

08/06/2016

Procedures for Making 11kV Cable Loop Joints.

Download File

CA2S/3

08/06/2016

E 5 Numbers for 11kV Cable Jointing Materials.

Download File

CA2T/4

08/06/2016

Tools Required for 11kV Cable Jointing.

Download File

CA2U/4

08/06/2016

Procedures for Making 11kV Cable EPR Terminations.

Download File

CA2V/4

23/01/2018

Procedures for Making 11kV Cable Straight Joints.

Download File

CA2W

08/06/2016

Procedure for Making an 11kV Trefoil Bond Joint.
 

Download File

TP18A

27/01/2016

Application of Generator Constraint Panels.

Download File

TP21D/2

21/10/2015

11kV, 6.6kV and LV Earthing.
 

Download File

TP21A/2

02/05/2014

Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment.
 

Download File

TP21K/1

08/07/2014

Substation Compound Fence Earthing.

Download File

EE82/1

08/03/2015

Specification for Single Core Wet Design of 11kV Medium Voltage EPR Insulated Cables.

Download File

EE132

28/08/2015

Earthing Materials and Associated Sundry Items.

Download File

SD1C

17/09/2015

Selection and Application of WPD Assessed Switchgear for Use on the Distribution Network.

Download File

SD1F/2

03/06/2016

Competition in Connections Code of Practice (COP) - Procedure for network analysis by Independent Connection Providers (ICPs).
 

Download File

SD1F/2 + Audit Form

03/06/2016

SD1F/2 - Point of Connection & Contestable Design Audit Form (hyperlinked to SD1F/2 - page 10).

Download File

SD4T

30/10/2017

The use of Simplified Load Flow Techniques for 11kV Network Design.

Download File

TP21B/1

07/04/2016

Design and Installation of Fixed Earthing Systems - Major Substations.

Download File

SD1G/1

22/04/2016

Communications Requirements for Parallel Generation Sites.

Download File

SD4A/1

06/07/2016

Design of Western Power Distribution's 11kV and 6.6kV Networks.

Download File

SD1E/2

03/03/2017

Technical Requirements for Customer Export Limiting Schemes.

Download File

SD1H/1

17/05/2017

The Treatment of Losses in an Inclusive Network Design Process.

Download File

EE136

03/07/2017

Ancillary Electrical Equipment for Use in Conjunction with Switchgear and Protection/Control Panels.

Download File

EE185/1

22/05/2018

12kV Primary Type Indoor Circuit Breakers.

Download File

SD7F/2

02/08/2017

Determination of Short Circuit Duty for Switchgear on the WPD Distribution System.

Download File

EE89/2

08/01/2013

Fixed Earthing Systems for Major Substations.

Download File

SD3/7

05/11/2014

66kV and 33kV System Design.

Download File

NC2D/2

05/03/2014

Specification of Connection Assets.
 

Download File

TP21A/2

02/05/2014

Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment.

Download File

TP21K/1

08/07/2014

Substation Compound Fence Earthing.
 

Download File

CA3A

19/04/2017

Jointing Configurations for 33kV Cables.
 

Download File

CA3C/3

19/04/2017

General Requirements for 33kV Cable Jointing.
 

Download File

CA3L/2

05/11/2014

Procedures for Making 33kV Single Core Cable EPR Branch Joints.
 

Download File

CA3M/4

05/11/2014

Procedures for Making 33kV Cable Straight Joints

Download File

CA3N/2

05/11/2014

Procedures for Making 33kV Single Core Cable Stop End Joints.

Download File

CA3P/2

05/11/2014

Procedures for Making a 33kV Trefoil Bond Joint.

Download File

CA3V/3

05/11/2014

Procedures for Making 33kV Cable Terminations.

Download File

CA3X

19/04/2017

E 5 Numbers for 33kV Cable Jointing Materials.
 

Download File

CA3Y

19/04/2017

Tools Required for 33kV Cable Jointing.
 

Download File

SD3A/2

04/12/2015

Low Voltage AC Supplies at 33kV and 66kV Substations.

Download File

EE132

28/08/2015

Earthing Materials and Associated Sundry Items.
 

Download File

SD1C

17/09/2015

Selection and Application of WPD Assessed Switchgear for Use on the Distribution Network.
 

Download File

SD1F/2

03/06/2016

Competition in Connections Code of Practice (COP) - Procedure for network analysis by Independent Connection Providers (ICPs).

Download File

SD1F/2 + Audit Form

03/06/2016

SD1F/2 - Point of Connection & Contestable Design Audit Form (hyperlinked to SD1F/2 - page 10).

Download File

TP18A

01/02/2016

Application of Generator Constraint Panels.
 

Download File

TP21B/1

07/04/2016

Design and Installation of Fixed Earthing Systems - Major Substations.

Download File

SD1G/1

22/04/2016

Communications Requirements for Parallel Generation Sites.

Download File

SD1E/3

19/01/2018

Technical Requirements for Customer Export Limiting Schemes.

Download File

SD1H/1

17/05/2017

The Treatment of Losses in an Inclusive Network Design Process.

Download File

EE136

03/07/2017

Ancillary Electrical Equipment for Use in Conjunction with Switchgear and Protection/Control Panels.

Download File

EE182

03/07/2017

36kV Indoor Primary Circuit Breakers.
 

Download File

SD7F/2

02/08/2017

Determination of Short Circuit Duty for Switchgear on the WPD Distribution System.

Download File

TP21S/1

12/09/2017

Application of Surge Arresters to Grid Transformers.

Download File

TP21S/1 + Calculator Spreadsheet

12/09/2017

TP21S/1 - Calculation Spreadsheet (hyperlinked to TP21S/1 - pages 3 & 6).

Download File

EE89/2

08/01/2013

Fixed Earthing Systems for Major Substations.

Download File

SD3/7

05/11/2014

66kV and 33kV System Design.
 

Download File

NC2D/2

05/03/2014

Specification of Connection Assets.

Download File

TP21A/2

02/05/2014

Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment.
 

Download File

TP21K/1

08/07/2014

Substation Compound Fence Earthing.
 

Download File

SD3A/2

04/12/2015

Low Voltage AC Supplies at 33kV and 66kV Substations.

Download File

EE132

28/08/2015

Earthing Materials and Associated Sundry Items.
 

Download File

SD1C

17/09/2015

Selection and Application of WPD Assessed Switchgear for Use on the Distribution Network.

Download File

SD1F/2

03/06/2016

Competition in Connections Code of Practice (COP) - Procedure for network analysis by Independent Connection Providers (ICPs).

Download File

SD1F/2 + Audit Form

03/06/2016

SD1F/2 - Point of Connection & Contestable Design Audit Form (hyperlinked to SD1F/2 - page 10).

Download File

TP21B/1

07/04/2016

Design and Installation of Fixed Earthing Systems - Major Substations.

Download File

SD1G/1

22/04/2016

Communications Requirements for Parallel Generation Sites.
 

Download File

SD1E/3

19/01/2018

Technical Requirements for Customer Export Limiting Schemes.

Download File

SD1H/1

17/05/2017

The Treatment of Losses in an Inclusive Network Design Process.

Download File

SD7F/2

02/08/2017

Determination of Short Circuit Duty for Switchgear on the WPD Distribution System.

Download File

TP21S/1

12/09/2017

Application of Surge Arresters to Grid Transformers.

Download File

TP21S/1 + Calculator Spreadsheet

12/09/2017

TP21S/1 - Calculation Spreadsheet (hyperlinked to TP21S/1 - pages 3 & 6).

Download File

EE89/2

08/01/2013

Fixed Earthing Systems for Major Substations.
 

Download File

SD2/6

06/01/2015

132kV System Design.
 

Download File

NC2D/2

05/03/2014

Specification of Connection Assets.

Download File

TP21A/2

02/05/2014

Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment.
 

Download File

TP21K/1

08/07/2014

Substation Compound Fence Earthing.
 

Download File

EE132

28/08/2015

Earthing Materials and Associated Sundry Items.
 

Download File

SD1C

17/09/2015

Selection and Application of WPD Assessed Switchgear for Use on the Distribution Network.

Download File

SD1F/2

03/06/2017

Competition in Connections Code of Practice (COP) - Procedure for network analysis by Independent Connection Providers (ICPs).

Download File

SD1F/2 + Audit Form

03/06/2016

SD1F/2 - Point of Connection & Contestable Design Audit Form (hyperlinked to SD1F/2 - page 10).

Download File

TP21B/1

07/04/2016

Design and Installation of Fixed Earthing Systems - Major Substations.

Download File

SD1G/1

22/04/2016

Communications Requirements for Parallel Generation Sites.
 

Download File

SD1E/3

19/01/2018

Technical Requirements for Customer Export Limiting Schemes.

Download File

SD1H/1

17/05/2017

The Treatment of Losses in an Inclusive Network Design Process.
 

Download File

SD7F/2

02/08/2017

Determination of Short Circuit Duty for Switchgear on the WPD Distribution System.
 

Download File

TP21S/1

12/09/2017

Application of Surge Arresters to Grid Transformers.

Download File

TP21S/1 + Calculator Spreadsheet

12/09/2017

TP21S/1 - Calculation Spreadsheet (hyperlinked to TP21S/1 - pages 3 & 6).

Download File

SD5F

30/10/2017

Connecting Multiple Small Low Voltage Connections with Limited Network Analysis.
 

Download File

SD5F

30/10/2017

Connecting Multiple Small Low Voltage Connections with Limited Network Analysis.
 

Download File

SD5F

30/10/2017

Connecting Multiple Small Low Voltage Connections with Limited Network Analysis.
 

Download File

SD4D

03/04/2018

The use of Simplified Load Flow Techniques for 11kV Network Design.

Download File

SD6F/1

19/01/2018

Dealing with Potentially Disturbing Electrical Loads/Equipment.

Download File

SD6F/1

19/01/2018

Dealing with Potentially Disturbing Electrical Loads/Equipment.

Download File

SD6F/1

19/01/2018

Dealing with Potentially Disturbing Electrical Loads/Equipment.

Download File

SD4E

14/05/2018

High Voltage Connections with Minimal Network Analysis

Download File

Contact us

Emergency information

0800 6783 105

General contact enquiries

0800 096 3080