In order to provide complete functionality this website needs your consent to store browser cookies. If you don't allow cookies, you may not be able to use certain features of the website including,but not limited to log in, order services, see personalised content or switch between languages. It is recommended that you allow cookies. More information

Documents

Please use the filter options below to find the documents that you require. 

Projects:
Type:
Order by:

EE98/8

15/08/2018

Approved Protection, Voltage Control and Alarm Relays and Test Access Blocks.
 

Download File

EE98/8

15/08/2018

Approved Protection, Voltage Control and Alarm Relays and Test Access Blocks.

Download File

EE98/8

15/08/2018

Approved Protection, Voltage Control and Alarm Relays and Test Access Blocks.
 

Download File

TP14D/4

01/08/2018

Commissioning of Distribution Business Provided Metering Facilities.

Download File

TP14D/4

01/08/2018

Commissioning of Distribution Business Provided Metering Facilities.

Download File

TP14D/4

01/08/2018

Commissioning of Distribution Business Provided Metering Facilities.

Download File

TP14D/4

01/08/2018

Commissioning of Distribution Business Provided Metering Facilities.
 

Download File

TP14D/4

01/08/2018

Commissioning of Distribution Business Provided Metering Facilities.

Download File

TP14D/4: Energisation Guidance Note

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Energisation Test Sheet

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Post-Energisation Guidance Note

01/08/2018

For Installations Other Than LV Combined Cut-Out, CT & Meter Cabinet Type.

Download File

TP14D/4: Post-Energisation Test Sheet

01/08/2018

For Installations Other Than LV Combined Cut-Out, CT & Meter Cabinet Type.

Download File

TP14D/4: Pre-Energisation Guidance Note

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Pre-Energisation Test Sheet

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Energisation Guidance Note

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Energisation Test Sheet

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Post-Energisation Guidance Note

01/08/2018

For Installations Other Than LV Combined Cut-Out, CT & Meter Cabinet Type.

Download File

TP14D/4: Post-Energisation Test Sheet

01/08/2018

For Installations Other Than LV Combined Cut-Out, CT & Meter Cabinet Type.

Download File

TP14D/4: Pre-Energisation Guidance Note

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Pre-Energisation Test Sheet

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Energisation Guidance Note

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Energisation Test Sheet

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Post-Energisation Guidance Note

01/08/2018

For Installations Other Than LV Combined Cut-Out, CT & Meter Cabinet Type.

Download File

TP14D/4: Post-Energisation Test Sheet

01/08/2018

For Installations Other Than LV Combined Cut-Out, CT & Meter Cabinet Type.

Download File

TP14D/4: Pre-Energisation Guidance Note

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Pre-Energisation Test Sheet

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Energisation Guidance Note

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Energisation Test Sheet

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Post-Energisation Guidance Note

01/08/2018

For Installations Other Than LV Combined Cut-Out, CT & Meter Cabinet Type.

Download File

TP14D/4: Post-Energisation Test Sheet

01/08/2018

For Installations Other Than LV Combined Cut-Out, CT & Meter Cabinet Type.

Download File

TP14D/4: Pre-Energisation Guidance Note

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Pre-Energisation Test Sheet

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Energisation Guidance Note

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Energisation Test Sheet

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Post-Energisation Guidance Note

01/08/2018

For Installations Other Than LV Combined Cut-Out, CT & Meter Cabinet Type.

Download File

TP14D/4: Post-Energisation Test Sheet

01/08/2018

For Installations Other Than LV Combined Cut-Out, CT & Meter Cabinet Type.

Download File

TP14D/4: Pre-Energisation Guidance Note

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

TP14D/4: Pre-Energisation Test Sheet

01/08/2018

For LV Combined Cut-Out, CT & Meter Cabinet Installations.

Download File

SD5C/3

25/07/2018

Low Voltage Connections to Multiple Occupancy Buildings.
 

Download File

TP18A/1

09/07/2018

Application of Generator Constraint Panels.

Download File

TP18A/1

09/07/2018

Application of Generator Constraint Panels.
 

Download File

TP18A/1

09/07/2018

Application of Generator Constraint Panels.
 

Download File

TP18A/1

09/07/2018

Application of Generator Constraint Panels.

Download File

EE182/1

09/07/2018

36kV Indoor Primary Circuit Breakers.
 

Download File

NC7C

11/06/2018

Installation and Record Requirements for LV Housing Developments.

Download File

NC7C

11/06/2018

Installation and Record Requirements for LV Housing Developments.

Download File

NC7C

11/06/2018

Installation and Record Requirements for LV Housing Developments.

Download File

NC7C

11/06/2018

Installation and Record Requirements for LV Housing Developments.

Download File

NC7C

11/06/2018

 Installation and Record Requirements for LV Housing Developments.

Download File

NC7C

11/06/2018

Installation and Record Requirements for LV Housing Developments.

Download File

NC7C

11/06/2018

Installation and Record Requirements for LV Housing Developments.

Download File

NC7C

11/06/2018

Installation and Record Requirements for LV Housing Developments.

Download File

33kV Connection Control Schematic

23/05/2018

PDF Drawing

Download File

33kV Connection Control Panel General Arrangement

23/05/2018

PDF Drawing

Download File

Connection Control Panel Interface Facility General Arrangement

23/05/2018

PDF Drawing

Download File

66kV Connection Control Schematic

23/05/2018

PDF Drawing

Download File

66kV Connection Control Panel General Arrangement

23/05/2018

PDF Drawing

Download File

Connection Control Panel Interface Facility General Arrangement

23/05/2018

PDF Drawing

Download File

132kV Connection Control Schematic

23/05/2018

PDF Drawing

Download File

132kV Connection Control Panel General Arrangement

23/05/2018

PDF Drawing

Download File

Connection Control Panel Interface Facility General Arrangement

23/05/2018

PDF Drawings

Download File

EE185/1

22/05/2018

12kV Primary Type Indoor Circuit Breakers.

Download File

SD4E

14/05/2018

High Voltage Connections with Minimal Network Analysis

Download File

AutoCAD Drawing GCS0015

04/05/2018

Indoor 33kV Tee'd Connection Layout.

Download File

AutoCAD Drawing GCS0016

04/05/2018

Indoor 33kV Looped Connection Layout.

Download File

33Kv Connection Guide

04/05/2018

PDF Drawing Pack.

Download File

AutoCAD Drawing GCS0021

04/05/2018

Outdoor 66kV Tee'd Connection Layout.

Download File

AutoCAD Drawing GCS0022

04/05/2018

Outdoor 66kV Looped Connection Layout.

Download File

AutoCAD Drawing SPC36C11A-GA

04/05/2018

Download File

AutoCAD Drawing SPC36C11A-AC

04/05/2018

Download File

AutoCAD Drawing SPC36C11A-DC

04/05/2018

Download File

66kV Connection Guide

04/05/2018

PDF Drawing Pack.

Download File

132kV Connection Guide

04/05/2018

PDF Drawing Pack.

Download File

TP21D/3

04/05/2018

11kV, 6.6kV and LV Earthing.
 

Download File

TP21D/3

04/05/2018

11kV, 6.6kV and LV Earthing.

Download File

66kV Connection Guide

04/05/2018

Outline Design Guide for Customers Seeking WPD Adoption of 66kV Switchgear, Associated Equipment, Compound & Control Room.
 

Download File

SPC145M1-AC

04/05/2018

AC Protection for 145kV Free Standing Metering CB.
 

Download File

SPC145M1-DC

04/05/2018

DC Protection for 145kV Free Standing Metering CB.
 

Download File

SPC145M1-GA

04/05/2018

GA of Control/Relay Panel for 145kV Free Standing Metering CB.

Download File

TP21D/3

04/05/2018

11kV, 6.6kV and LV Earthing.

Download File

TP21D/3

04/05/2018

11kV, 6.6kV and LV Earthing.

Download File

TP21D/3

04/05/2018

11kV, 6.6kV and LV Earthing.
 

Download File

TP21D/3

04/05/2018

11kV, 6.6kV and LV Earthing.

Download File

33kV Indoor Connection Guide

04/05/2018

33kV Indoor Metered Connection - Guidance For Substation Designers.

Download File

TP21D/3

04/05/2018

11kV, 6.6kV and LV Earthing.

Download File

TP21D/3

04/05/2018

11kV, 6.6kV and LV Earthing.
 

Download File

TP21D/3

04/05/2018

11kV, 6.6kV and LV Earthing.

Download File

TP21D/3

04/05/2018

11kV, 6.6kV and LV Earthing.

Download File

WPD G81 Part 5

19/04/2018

Framework for materials specification for industrial and commercial underground connected loads up to and including 11kV.
 

Download File

CA6A/5

19/04/2018

Installation of Underground Cables.
 

Download File

WPD G81 Part 5

19/04/2018

Framework for materials specification for industrial and commercial underground connected loads up to and including 11kV.

Download File

CA6A/5

19/04/2018

Installation of Underground Cables.

Download File

OH6/2

19/04/2018

Construction, Maintenance and Replacement of Low Voltage Overhead Services.
 

Download File

EE79/2

19/04/2018

Specification for SCADA Multipair Light Current Control Cables.
 

Download File

EE79/2

19/04/2018

Specification for SCADA Multipair Light Current Control Cables.
 

Download File

WPD G81 Part 5

19/04/2018

Framework for materials specification for industrial and commercial underground connected loads up to and including 11kV.
 

Download File

EE19/7

19/04/2018

Specification on GRP Substation Enclosures.
 

Download File

EE79/2

19/04/2018

Specification for SCADA Multipair Light Current Control Cables.
 

Download File

WPD G81 Part 5

19/04/2018

Framework for materials specification for industrial and commercial underground connected loads up to and including 11kV.
 

Download File

EE79/2

19/04/2018

Specification for SCADA Multipair Light Current Control Cables.

Download File

CA6A/5

19/04/2018

Installation of Underground Cables.

Download File

CA6A/5

19/04/2018

Installation of Underground Cables.
 

Download File

CA6A/5

19/04/2018

Installation of Underground Cables.
 

Download File

EE79/2

19/04/2018

Specification for SCADA Multipair Light Current Control Cables.
 

Download File

SD5P/3

19/04/2018

Design of Unmetered Connections.
 

Download File

SD5P/3

19/04/2018

Design of Unmetered Connections.

Download File

SD5K/6

19/04/2018

Use of WinDebut Software.

Download File

SD7A/7

19/04/2018

Data Sets Used with Windebut Software.
 

Download File

WPD G81 Part 5

19/04/2018

Framework for materials specification for industrial and commercial underground connected loads up to and including 11kV.

Download File

NC2L/8

19/04/2018

Independent Connection Provider (ICP) High and Low Voltage Connections under ICP or WPD DSRs.
 

Download File

NC2L/8

19/04/2018

Independent Connection Provider (ICP) High and Low Voltage Connections under ICP or WPD DSRs.
 

Download File

NC2L/8

19/04/2018

Independent Connection Provider (ICP) High and Low Voltage Connections under ICP or WPD DSRs.
 

Download File

NC2L/8

19/04/2018

Independent Connection Provider (ICP) High and Low Voltage Connections under ICP or WPD DSRs.
 

Download File

NC2L/8

19/04/2018

Independent Connection Provider (ICP) High and Low Voltage Connections under ICP or WPD DSRs.
 

Download File

NC2L/8

19/04/2018

Independent Connection Provider (ICP) High and Low Voltage Connections under ICP or WPD DSRs.
 

Download File

NC2L/8

19/04/2018

Independent Connection Provider (ICP) High and Low Voltage Connections under ICP or WPD DSRs.

Download File

NC2L/8

19/04/2018

Independent Connection Provider (ICP) High and Low Voltage Connections under ICP or WPD DSRs.

Download File

OC1L/1

19/04/2018

Operational Procedure for Independent Connection Providers carrying out HV Connection Works under Option 4 of the ICP Self Connect Process.
 

Download File

SD4D

03/04/2018

The use of Simplified Load Flow Techniques for 11kV Network Design.

Download File

NC2F/4

28/03/2018

Design Approval.
 

Download File

NC2F/4

28/03/2018

Design Approval.

Download File

NC2F/4

28/03/2018

Design Approval.
 

Download File

NC2F/4

28/03/2018

Design Approval.
 

Download File

SL36C5A

26/01/2018

Single Line Diagram for 36kV Feeder with Pilot Wire Protection.

Download File

AutoCAD Drawing SL36C5A

26/01/2018

AutoCAD version of drawing SL36C5A.

Download File

SL36C11A

26/01/2018

Single Line Diagram of 36kV Incoming CCT with Metering. 

Download File

AutoCAD Drawing SL36C11A

26/01/2018

AutoCAD version of drawing SL36C11A.

Download File

SL36C12A

26/01/2018

Single Line Diagram for 36kV Outgoing CCT with Metering. 

Download File

AutoCAD Drawing SL36C12A

26/01/2018

AutoCAD version of drawing SL36C12A.

Download File

AutoCAD Drawing SPC36C5A-AC

26/01/2018

AutoCAD version of drawing SPC36C5A-AC.

Download File

SPC36C5A-AC

26/01/2018

AC Scheme for 36kV Feeder with Pilot Protection.

Download File

SPC36C5A-DC

26/01/2018

DC Scheme for 36kV Feeder with Pilot Wire Protection.

Download File

AutoCAD Drawing SPC36C5A-DC

26/01/2018

AutoCAD version of drawing SPC36C5A-DC.

Download File

SPC36C10A-DC

26/01/2018

DC Scheme for 36kV CCT without Protection.

Download File

AutoCAD Drawing SPC36C10A-DC

26/01/2018

AutoCAD version of drawing SPC36C10A-DC.

Download File

SPC36C11A-AC

26/01/2018

AC Scheme for 36kV Incoming CCT with Metering.
 

Download File

AutoCAD Drawing SPC36C11A-AC

26/01/2018

AutoCAD version of drawing SPC36C11A-AC.

Download File

SPC36C11A-DC

26/01/2018

DC Scheme for 36kV Incoming CCT with Metering.

Download File

AutoCAD Drawing SPC36C11A-DC

26/01/2018

AutoCAD version of drawing SPC36C11A-DC.

Download File

SPC36C12A-AC

26/01/2018

AC Scheme for 36kV Outgoing CCT with Metering.
 

Download File

AutoCAD Drawing SPC36C12A-AC

26/01/2018

AutoCAD version of drawing SPC36C12A-AC.

Download File

SPC36C12A-DC

26/01/2018

DC Scheme for 36kV Outgoing CCT with Metering.

Download File

AutoCAD Drawing SPC36C12A-DC

26/01/2018

AutoCAD version of drawing SPC36C12A-DC.

Download File

CA2V/4

23/01/2018

Procedures for Making 11kV Cable Straight Joints.

Download File

EE16/8

23/01/2018

LV Distribution Fuseboards.
 

Download File

EE28/6

23/01/2018

Low Voltage Intake Metering Panels.
 

Download File

EE53/1

23/01/2018

Guided or Directional Boring.
 

Download File

EE53/1

23/01/2018

Guided or Directional Boring.

Download File

EE53/1

23/01/2018

Guided or Directional Boring.
 

Download File

EE28/6

23/01/2018

Low Voltage Intake Metering Panels.

Download File

EE53/1

23/01/2018

Guided or Directional Boring.
 

Download File

EE53/1

23/01/2018

Guided or Directional Boring.

Download File

EE87/7

19/01/2018

Protection, Alarm and Control Panels Associated with 36kV AND 72kV Outdoor Switchgear, 33kV and 66kV Transformers and Control Panels Associated with Arc Suppression Coils.
 

Download File

EE87/7

19/01/2018

Protection, Alarm and Control Panels Associated with 36kV AND 72kV Outdoor Switchgear, 33kV and 66kV Transformers and Control Panels Associated with Arc Suppression Coils.

Download File

CA2C/9

19/01/2018

General Requirements for 11kV Cable Jointing.
 

Download File

CA2N/6

19/01/2018

Procedures for Making 11kV Cable Stop Ends.

Download File

SD1E/3

19/01/2018

Technical Requirements for Customer Export Limiting Schemes.

Download File

SD5R/2

19/01/2018

Earth Fault Loop Impedances and Phase to Neutral Loop Impedances at LV Installations.
 

Download File

SD1E/3

19/01/2018

Technical Requirements for Customer Export Limiting Schemes.

Download File

SD5A/3

19/01/2018

Design of Low Voltage Domestic Connections.
 

Download File

OS10C/4

19/01/2018

Pressure Testing of High Voltage Apparatus.
 

Download File

OS10C/4

19/01/2018

Pressure Testing of High Voltage Apparatus.

Download File

OS10C/4

19/01/2018

Pressure Testing of High Voltage Apparatus.
 

Download File

OS10C/4

19/01/2018

Pressure Testing of High Voltage Apparatus.

Download File

SD1E/3

19/01/2018

Technical Requirements for Customer Export Limiting Schemes.

Download File

SD1E/3

19/01/2018

Technical Requirements for Customer Export Limiting Schemes.

Download File

SD6F/1

19/01/2018

Dealing with Potentially Disturbing Electrical Loads/Equipment.

Download File

SD6F/1

19/01/2018

Dealing with Potentially Disturbing Electrical Loads/Equipment.

Download File

SD6F/1

19/01/2018

Dealing with Potentially Disturbing Electrical Loads/Equipment.

Download File

SD5F

30/10/2017

Connecting Multiple Small Low Voltage Connections with Limited Network Analysis.
 

Download File

SD5F

30/10/2017

Connecting Multiple Small Low Voltage Connections with Limited Network Analysis.
 

Download File

SD5F

30/10/2017

Connecting Multiple Small Low Voltage Connections with Limited Network Analysis.
 

Download File

SD4T

30/10/2017

The use of Simplified Load Flow Techniques for 11kV Network Design.

Download File

TP14J

09/10/2017

Management of Metering CT & VT Test Certificates.

Download File

TP14J

09/10/2017

Management of Metering CT & VT Test Certificates.

Download File

TP14J

09/10/2017

Management of Metering CT & VT Test Certificates.

Download File

TP14J

09/10/2017

Management of Metering CT & VT Test Certificates.
 

Download File

TP14J

09/10/2017

Management of Metering CT & VT Test Certificates.
 

Download File

TP21S/1

12/09/2017

Application of Surge Arresters to Grid Transformers.

Download File

TP21S/1 + Calculator Spreadsheet

12/09/2017

TP21S/1 - Calculation Spreadsheet (hyperlinked to TP21S/1 - pages 3 & 6).

Download File

TP21S/1

12/09/2017

Application of Surge Arresters to Grid Transformers.

Download File

TP21S/1 + Calculator Spreadsheet

12/09/2017

TP21S/1 - Calculation Spreadsheet (hyperlinked to TP21S/1 - pages 3 & 6).

Download File

TP21S/1

12/09/2017

Application of Surge Arresters to Grid Transformers.

Download File

TP21S/1 + Calculator Spreadsheet

12/09/2017

TP21S/1 - Calculation Spreadsheet (hyperlinked to TP21S/1 - pages 3 & 6).

Download File

OS7H/1

31/08/2017

Due diligence checks on ICP safety management systems and ICP operational site performance as well as operational induction briefings and tests for non WPD Authorised SAP(s).
 

Download File

OS7H/1

31/08/2017

Due diligence checks on ICP safety management systems and ICP operational site performance as well as operational induction briefings and tests for non WPD Authorised SAP(s).
 

Download File

SD5E/1

14/08/2017

Design of Low Voltage Commercial and Industrial Connections.

Download File

SD7F/2

02/08/2017

Determination of Short Circuit Duty for Switchgear on the WPD Distribution System.

Download File

SD7F/2

02/08/2017

Determination of Short Circuit Duty for Switchgear on the WPD Distribution System.

Download File

SD7F/2

02/08/2017

Determination of Short Circuit Duty for Switchgear on the WPD Distribution System.

Download File

SD7F/2

02/08/2017

Determination of Short Circuit Duty for Switchgear on the WPD Distribution System.
 

Download File

EE104/1 + battery calculator document

05/07/2017

Battery Calculator (hyperlinked to EE104/1 - page 40).

Download File

EE104/1 + battery calculator document

05/07/2017

Battery Calculator (hyperlinked to EE104/1 - page 40).

Download File

EE104/1 + battery calculator document

05/07/2017

Battery Calculator (hyperlinked to EE104/1 - page 40).

Download File

EE104/1 + battery calculator document

05/07/2017

Battery Calculator (hyperlinked to EE104/1 - page 40).

Download File

EE136

03/07/2017

Ancillary Electrical Equipment for Use in Conjunction with Switchgear and Protection/Control Panels.

Download File

EE136

03/07/2017

Ancillary Electrical Equipment for Use in Conjunction with Switchgear and Protection/Control Panels.

Download File

SD1F/2

03/06/2017

Competition in Connections Code of Practice (COP) - Procedure for network analysis by Independent Connection Providers (ICPs).

Download File

SD1H/1

17/05/2017

The Treatment of Losses in an Inclusive Network Design Process.
 

Download File

SD1H/1

17/05/2017

The Treatment of Losses in an Inclusive Network Design Process.

Download File

SD1H/1

17/05/2017

The Treatment of Losses in an Inclusive Network Design Process.

Download File

SD1H/1

17/05/2017

The Treatment of Losses in an Inclusive Network Design Process.

Download File

SD1H/1

17/05/2017

The Treatment of Losses in an Inclusive Network Design Process.

Download File

SD5E/1 + Calculation Spreadsheet

21/04/2017

SD5E/1 - Calculation Spreadsheet (hyperlinked to SD5E/1 - pages 13, 15 & 35).

Download File

CA3A

19/04/2017

Jointing Configurations for 33kV Cables.
 

Download File

CA3C/3

19/04/2017

General Requirements for 33kV Cable Jointing.
 

Download File

CA3X

19/04/2017

E 5 Numbers for 33kV Cable Jointing Materials.
 

Download File

CA3Y

19/04/2017

Tools Required for 33kV Cable Jointing.
 

Download File

SD1E/2

03/03/2017

Technical Requirements for Customer Export Limiting Schemes.

Download File

CA1C/8

03/02/2017

General Requirements Low Voltage Mains Jointing.
 

Download File

EE133

03/02/2017

Steel Mast Supports for High Voltage Overhead Lines.

Download File

EE133

03/02/2017

Steel Mast Supports for High Voltage Overhead Lines.
 

Download File

EE133

03/02/2017

Steel Mast Supports for High Voltage Overhead Lines.

Download File

Distribution Safety Rules

23/12/2016

Distribution Safety Rule.
 

Download File

Distribution Safety Rules

23/12/2016

Distribution Safety Rule.

Download File

Distribution Safety Rules

23/12/2016

Distribution Safety Rule.
 

Download File

Distribution Safety Rules

23/12/2016

Distribution Safety Rule.
 

Download File

Distribution Safety Rules

23/12/2016

Distribution Safety Rule.

Download File

SD4A/2

06/07/2016

Design of Western Power Distribution's 11kV and 6.6kV Networks.

Download File

CA2O/4

08/06/2016

Procedures for Making 11kV Cable Loop Joints.

Download File

CA2S/3

08/06/2016

E 5 Numbers for 11kV Cable Jointing Materials.

Download File

CA2T/4

08/06/2016

Tools Required for 11kV Cable Jointing.

Download File

CA2U/4

08/06/2016

Procedures for Making 11kV Cable EPR Terminations.

Download File

CA2M/4

08/06/2016

Procedures for Making 11kV Cable Branch Joints.
 

Download File

CA2A/2

08/06/2016

Jointing Configurations for 11kV Cables.

Download File

CA2W

08/06/2016

Procedure for Making an 11kV Trefoil Bond Joint.
 

Download File

SD1F/2

03/06/2016

Competition in Connections Code of Practice (COP) - Procedure for network analysis by Independent Connection Providers (ICPs).

 

Download File

SD1F/2 + Audit Form

03/06/2016

SD1F/2 - Point of Connection & Contestable Design Audit Form (hyperlinked to SD1F/2 - page 10).

Download File

SD1F/2

03/06/2016

Competition in Connections Code of Practice (COP) - Procedure for network analysis by Independent Connection Providers (ICPs).
 

Download File

SD1F/2 + Audit Form

03/06/2016

SD1F/2 - Point of Connection & Contestable Design Audit Form (hyperlinked to SD1F/2 - page 10).

Download File

SD1F/2

03/06/2016

Competition in Connections Code of Practice (COP) - Procedure for network analysis by Independent Connection Providers (ICPs).

Download File

SD1F/2 + Audit Form

03/06/2016

SD1F/2 - Point of Connection & Contestable Design Audit Form (hyperlinked to SD1F/2 - page 10).

Download File

SD1F/2

03/06/2016

Competition in Connections Code of Practice (COP) - Procedure for network analysis by Independent Connection Providers (ICPs).

Download File

SD1F/2 + Audit Form

03/06/2016

SD1F/2 - Point of Connection & Contestable Design Audit Form (hyperlinked to SD1F/2 - page 10).

Download File

SD1F/2 + Audit Form

03/06/2016

SD1F/2 - Point of Connection & Contestable Design Audit Form (hyperlinked to SD1F/2 - page 10).

Download File

NC2M/2

23/05/2016

Inspection, Recording and Commissioning Using The Inspection and Monitoring Regime.
 

Download File

NC2M/2

23/05/2016

Inspection, Recording and Commissioning Using The Inspection and Monitoring Regime.
 

Download File

NC2M/2

23/05/2016

Inspection, Recording and Commissioning Using The Inspection and Monitoring Regime.
 

Download File

NC2M/2

23/05/2016

Inspection, Recording and Commissioning Using The Inspection and Monitoring Regime.
 

Download File

NC6A/6

23/05/2016

Responding to an Enquiry for the Connection of an Embedded Network to WPD's Distribution System.
 

Download File

NC6A/6

23/05/2016

Responding to an Enquiry for the Connection of an Embedded Network to WPD's Distribution System.
 

Download File

EE104/1

23/05/2016

Substation 24V & 48V Batteries, Chargers, Distribution Boards & Associated Auxiliary Cabling.

Download File

NC2G/3

23/05/2016

Network Access and Adoption Agreements.
 

Download File

NC6A/6

23/05/2016

Responding to an Enquiry for the Connection of an Embedded Network to WPD's Distribution System.
 

Download File

NC2G/3

23/05/2016

Network Access and Adoption Agreements.
 

Download File

NC2G/3

23/05/2016

Network Access and Adoption Agreements.

Download File

NC2G/3

23/05/2016

Network Access and Adoption Agreements.
 

Download File

NC2G/3

23/05/2016

Network Access and Adoption Agreements.
 

Download File

NC6A/6

23/05/2016

Responding to an Enquiry for the Connection of an Embedded Network to WPD's Distribution System.
 

Download File

NC6A/6

23/05/2016

Responding to an Enquiry for the Connection of an Embedded Network to WPD's Distribution System.
 

Download File

NC6A/6

23/05/2016

Responding to an Enquiry for the Connection of an Embedded Network to WPD's Distribution System.
 

Download File

NC6A/6

23/05/2016

Responding to an Enquiry for the Connection of an Embedded Network to WPD's Distribution System.
 

Download File

NC2G/3

23/05/2016

Network Access and Adoption Agreements.
 

Download File

NC2G/3

23/05/2016

Network Access and Adoption Agreements.

Download File

NC2M/2

23/05/2016

Inspection, Recording and Commissioning Using The Inspection and Monitoring Regime.
 

Download File

NC2M/2

23/05/2016

Inspection, Recording and Commissioning Using The Inspection and Monitoring Regime.

Download File

NC2M/2

23/05/2016

Inspection, Recording and Commissioning Using The Inspection and Monitoring Regime.
 

Download File

EE104/1

23/05/2016

Substation 24V & 48V Batteries, Chargers, Distribution Boards & Associated Auxiliary Cabling.
 

Download File

NC2M/2

23/05/2016

Inspection, Recording and Commissioning Using The Inspection and Monitoring Regime.
 

Download File

EE104/1

23/05/2016

Substation 24V & 48V Batteries, Chargers, Distribution Boards & Associated Auxiliary Cabling.

Download File

EE104/1

23/05/2016

Substation 24V & 48V Batteries, Chargers, Distribution Boards & Associated Auxiliary Cabling.

Download File

WPD G81 Part 4

28/04/2016

Framework for Design and Planning of Industrial and Commercial Underground Connected Loads up to and including 11kV.
 

Download File

SD1G/1

22/04/2016

Communications Requirements for Parallel Generation Sites.

Download File

SD1G/1

22/04/2016

Communications Requirements for Parallel Generation Sites.

Download File

SD1G/1

22/04/2016

Communications Requirements for Parallel Generation Sites.
 

Download File

SD1G/1

22/04/2016

Communications Requirements for Parallel Generation Sites.
 

Download File

EE93/2

19/04/2016

Specification for Single Core Wet Design of 66kV High Voltage EPR Insulated Cables.
 

Download File

SD6J

08/04/2016

Connection design - potentially disturbing electrical equipment rated less than or equal to 75A / phase subject to conditional connection.

Download File

OS4A/2

08/04/2016

The Location, Identification and Proving Dead of Underground Cables.
 

Download File

OS4B

08/04/2016

Identification and Proving Dead of Overhead Lines.
 

Download File

OS4A/2

08/04/2016

The Location, Identification and Proving Dead of Underground Cables.
 

Download File

OS4B

08/04/2016

Identification and Proving Dead of Overhead Lines.

Download File

OS4A/2

08/04/2016

The Location, Identification and Proving Dead of Underground Cables.

Download File

OS4B

08/04/2016

Identification and Proving Dead of Overhead Lines.
 

Download File

OS4A/2

08/04/2016

The Location, Identification and Proving Dead of Underground Cables.
 

Download File

OS4B

08/04/2016

Identification and Proving Dead of Overhead Lines.
 

Download File

OC1A/5

07/04/2016

High Voltage System Control and Switching.

Download File

OC1K

07/04/2016

Transfer of Control of WPD Network between WPD Central Control and ICP Control.

Download File

OC3C/2

07/04/2016

The Identification and Proving Dead of Plant and Apparatus.
 

Download File

OC1A/5

07/04/2016

High Voltage System Control and Switching.

Download File

OC1K

07/04/2016

Transfer of Control of WPD Network between WPD Central Control and ICP Control.
 

Download File

OC3C/2

07/04/2016

The Identification and Proving Dead of Plant and Apparatus.
 

Download File

OC1A/5

07/04/2016

High Voltage System Control and Switching.
 

Download File

OC1K

07/04/2016

Transfer of Control of WPD Network between WPD Central Control and ICP Control.
 

Download File

OC3C/2

07/04/2016

The Identification and Proving Dead of Plant and Apparatus.
 

Download File

OC1A/5

07/04/2016

High Voltage System Control and Switching.

Download File

OC1K

07/04/2016

Transfer of Control of WPD Network between WPD Central Control and ICP Control.
 

Download File

OC3C/2

07/04/2016

The Identification and Proving Dead of Plant and Apparatus.

Download File

TP21B/1

07/04/2016

Design and Installation of Fixed Earthing Systems - Major Substations.

Download File

TP21B/1

07/04/2016

Design and Installation of Fixed Earthing Systems - Major Substations.

Download File

TP21B/1

07/04/2016

Design and Installation of Fixed Earthing Systems - Major Substations.

Download File

TP21B/1

07/04/2016

Design and Installation of Fixed Earthing Systems - Major Substations.

Download File

TP21B/1

07/04/2016

Design and Installation of Fixed Earthing Systems - Major Substations.

Download File

TP21B/1

07/04/2016

Design and Installation of Fixed Earthing Systems - Major Substations.

Download File

TP21B/1

07/04/2016

Design and Installation of Fixed Earthing Systems - Major Substations.

Download File

TP21B/1

07/04/2016

Design and Installation of Fixed Earthing Systems - Major Substations.

Download File

OH1A/3

24/03/2016

Overhead Line Clearances to Ground and Objects for Reasons of Safety.

Download File

OH1A/3

24/03/2016

Overhead Line Clearances to Ground and Objects for Reasons of Safety.

Download File

OH1A/3

24/03/2016

Overhead Line Clearances to Ground and Objects for Reasons of Safety.

Download File

OH1A/3

24/03/2016

Overhead Line Clearances to Ground and Objects for Reasons of Safety.

Download File

OH1A/3

24/03/2016

Overhead Line Clearances to Ground and Objects for Reasons of Safety.

Download File

TP6F/1

12/02/2016

Power Measurement Conventions.
 

Download File

TP6F/1

12/02/2016

Power Measurement Conventions.

Download File

TP6F/1

12/02/2016

Power Measurement Conventions.

Download File

TP6F/1

12/02/2016

Power Measurement Conventions.

Download File

CAØM/4

11/02/2016

Procedures for Making LV Service Cable Branch Joints.
 

Download File

SD3A/2

04/12/2015

Low Voltage AC Supplies at 33kV and 66kV Substations.
 

Download File

SD3A/2

04/12/2015

Low Voltage AC Supplies at 33kV and 66kV Substations.

Download File

SD3A/2

04/12/2015

Low Voltage AC Supplies at 33kV and 66kV Substations.

Download File

SD3A/2

04/12/2015

Low Voltage AC Supplies at 33kV and 66kV Substations.

Download File

NC2N

14/10/2015

The ICP Operating Manual.
 

Download File

NC2N

14/10/2015

The ICP Operating Manual.
 

Download File

NC2N

14/10/2015

The ICP Operating Manual.

Download File

NC2N

14/10/2015

The ICP Operating Manual.

Download File

DO6A/2

14/10/2015

Standards for Recording Techniques and Procedures of the Company's Underground Assets.
 

Download File

DO6A/2

14/10/2015

Standards for Recording Techniques and Procedures of the Company's Underground Assets.
 

Download File

DO6A/2

14/10/2015

Standards for Recording Techniques and Procedures of the Company's Underground Assets.

Download File

DO6A/2

14/10/2015

Standards for Recording Techniques and Procedures of the Company's Underground Assets.

Download File

DO6A/3

14/10/2015

Standards for Recording Techniques and Procedures of the Company's Underground Assets.
 

Download File

SD4O/1

14/10/2015

Standard HV Connection Arrangements.

Download File

SD5B

17/09/2015

Low Voltage Connections with Minimal Network Analysis.

Download File

SD1C

17/09/2015

Selection and Application of WPD Assessed Switchgear for Use on the Distribution Network.

Download File

SD1C

17/09/2015

Selection and Application of WPD Assessed Switchgear for Use on the Distribution Network.
 

Download File

PSD-A-36M2-AC

17/09/2015

S Wales Variant - AC Protection for 36kV Free Standing Metering CB (Alstom/Schneider Protection).
 

Download File

PSD-A-36M2-DC

17/09/2015

S Wales Variant - DC Protection for 36kV Free Standing Metering CB (Alstom/Schneider Protection).
 

Download File

SPC36M2-AC

17/09/2015

AC Protection for 36kV Free Standing Metering CB (Alstom/Schneider Protection).

Download File

SPC36M2-DC

17/09/2015

DC Protection for 36kV Free Standing Metering CB (Alstom/Schneider Protection).
 

Download File

SD1C

17/09/2015

Selection and Application of WPD Assessed Switchgear for Use on the Distribution Network.

Download File

SD1C

17/09/2015

Selection and Application of WPD Assessed Switchgear for Use on the Distribution Network.

Download File

EE132

28/08/2015

Earthing Materials and Associated Sundry Items.
 

Download File

EE132

28/08/2015

Earthing Materials and Associated Sundry Items.
 

Download File

EE129/1

28/08/2015

Specification for Wood Poles and Associated Timber for Overhead Lines.

Download File

EE129/1

28/08/2015

Specification for Wood Poles and Associated Timber for Overhead Lines.
 

Download File

EE129/1

28/08/2015

Specification for Wood Poles and Associated Timber for Overhead Lines.

Download File

EE132

28/08/2015

Earthing Materials and Associated Sundry Items.
 

Download File

EE132

28/08/2015

Earthing Materials and Associated Sundry Items.

Download File

EE132

28/08/2015

Earthing Materials and Associated Sundry Items.

Download File

SD4/7

15/07/2015

11kV and 6.6kV System Design.
 

Download File

EE25/5 + battery calculator document

15/07/2015

Battery Calculator (hyperlinked to EE25/5 - page 36).

Download File

EE25/5 + battery calculator document

15/07/2015

Battery Calculator (hyperlinked to EE25/5 - page 36).

Download File

EE25/5 + battery calculator document

15/07/2015

Battery Calculator (hyperlinked to EE25/5 - page 36).

Download File

EE25/5 + battery calculator document

15/07/2015

Battery Calculator (hyperlinked to EE25/5 - page 36).

Download File

EE4/7

03/06/2015

5 MVA (uprateable to 6.25 MVA) 33/11.5kV Transformers, Delta/Star and Star/Star Connected.

Download File

EE8/8

03/06/2015

Emergency Rated System Transformers - 66/11.5kV and 33/11.5kV Delta/Star and Star/Star connected.

Download File

EE23

28/05/2015

110V and 220V Batteries, Chargers, Controllers, Distribution Boards & Associated Auxiliary Cabling for Primary Network Substations Other Than Metering Circuit Breaker Type.

Download File

EE23

28/05/2015

110V and 220V Batteries, Chargers, Controllers, Distribution Boards & Associated Auxiliary Cabling for Primary Network Substations Other Than Metering Circuit Breaker Type.

Download File

EE25/5

28/05/2015

110V Batteries, Chargers, Distribution Boards & Associated Auxiliary Cabling for Metering Circuit Breaker Type Primary Network Substations.

Download File

EE23

28/05/2015

110V and 220V Batteries, Chargers, Controllers, Distribution Boards & Associated Auxiliary Cabling for Primary Network Substations Other Than Metering Circuit Breaker Type.
 

Download File

OH4N/4

28/05/2015

Notices, Signs & Labels for Overhead Lines.

Download File

OH4H/5

28/05/2015

Mounting of Auxiliary Equipment on Wood Poles.

Download File

OH4N/4

28/05/2015

Notices, Signs & Labels for Overhead Lines.

Download File

OH4N/4

28/05/2015

Notices, Signs & Labels for Overhead Lines.
 

Download File

OH4H/5

28/05/2015

Mounting of Auxiliary Equipment on Wood Poles.

Download File

OH4N/4

28/05/2015

Notices, Signs & Labels for Overhead Lines.

Download File

OH4N/4

28/05/2015

Notices, Signs & Labels for Overhead Lines.

Download File

EE23

28/05/2015

110V and 220V Batteries, Chargers, Controllers, Distribution Boards & Associated Auxiliary Cabling for Primary Network Substations Other Than Metering Circuit Breaker Type.
 

Download File

EE25/5

28/05/2015

110V Batteries, Chargers, Distribution Boards & Associated Auxiliary Cabling for Metering Circuit Breaker Type Primary Network Substations.

Download File

EE25/5

28/05/2015

110V Batteries, Chargers, Distribution Boards & Associated Auxiliary Cabling for Metering Circuit Breaker Type Primary Network Substations.
 

Download File

EE25/5

28/05/2015

110V Batteries, Chargers, Distribution Boards & Associated Auxiliary Cabling for Metering Circuit Breaker Type Primary Network Substations.

Download File

WPD G81 Part 2

13/05/2015

Housing Development Materials Framework.

Download File

WPD G81 Part 2

13/05/2015

Housing Development Materials Framework.

Download File

WPD G81 Part 2

13/05/2015

Housing Development Materials Framework.
 

Download File

WPD G81 Part 2

13/05/2015

Housing Development Materials Framework.

Download File

WPD G81 Part 2

13/05/2015

Housing Development Materials Framework.

Download File

WPD G81 Part 2

13/05/2015

Housing Development Materials Framework.
 

Download File

WPD G81 Part 2

13/05/2015

Housing Development Materials Framework.

Download File

WPD G81 Part 2

13/05/2015

Housing Development Materials Framework.

Download File

WPD G81 Part 2

13/05/2015

Housing Development Materials Framework.

Download File

EE82/1

18/03/2015

Specification for Single Core Wet Design of 11kV Medium Voltage EPR Insulated Cables.
 

Download File

EE82/1

08/03/2015

Specification for Single Core Wet Design of 11kV Medium Voltage EPR Insulated Cables.

Download File

SD5/4

25/02/2015

LV System Design.

Download File

EE2/6

18/02/2015

12kV Cable Connected Outdoor Switchgear - Non Oil Type.

Download File

EE10/2

18/02/2015

12kV and 36kV Outdoor Overhead Conductor Connected Switchgear and VTs (Based on ENA Technical Specification 41-36).

Download File

EE78/1

06/01/2015

Specification for Multipair Cables.
 

Download File

EE80/1

06/01/2015

Specification for Multicore Cables.
 

Download File

EE78/1

06/01/2015

Specification for Multipair Cables.
 

Download File

EE80/1

06/01/2015

Specification for Multicore Cables.
 

Download File

EE78/1

06/01/2015

Specification for Multipair Cables.

Download File

EE80/1

06/01/2015

Specification for Multicore Cables.

Download File

SD2/6

06/01/2015

132kV System Design.

Download File

EE78/1

06/01/2015

Specification for Multipair Cables.
 

Download File

EE80/1

06/01/2015

Specification for Multicore Cables.

Download File

TP14C

06/01/2015

Distribution Business Provided Metering Facilities.
 

Download File

TP14C

06/01/2015

Distribution Business Provided Metering Facilities.

Download File

TP14C

06/01/2015

Distribution Business Provided Metering Facilities.

Download File

TP14C

06/01/2015

Distribution Business Provided Metering Facilities.
 

Download File

TP14C

06/01/2015

Distribution Business Provided Metering Facilities.
 

Download File

SD2/6

06/01/2015

132kV System Design.
 

Download File

SD3/7

05/11/2014

66kV and 33kV System Design.
 

Download File

CA3L/2

05/11/2014

Procedures for Making 33kV Single Core Cable EPR Branch Joints.
 

Download File

CA3M/4

05/11/2014

Procedures for Making 33kV Cable Straight Joints

Download File

CA3N/2

05/11/2014

Procedures for Making 33kV Single Core Cable Stop End Joints.

Download File

CA3P/2

05/11/2014

Procedures for Making a 33kV Trefoil Bond Joint.

Download File

CA3V/3

05/11/2014

Procedures for Making 33kV Cable Terminations.

Download File

SD3/7

05/11/2014

66kV and 33kV System Design.

Download File

SP1N

09/10/2014

Heating, Dehumidification and Ventilation of Switch Rooms and Control Rooms at Grid, Primary and Major Network Substations.

Download File

SP1N

09/10/2014

Heating, Dehumidification and Ventilation of Switch Rooms and Control Rooms at Grid, Primary and Major Network Substations.

Download File

CAØN/2

09/10/2014

Procedures for Making LV Service Cable Stop Ends.
 

Download File

CAØU/2

09/10/2014

Procedures for Making LV Service Cable Cut-Out Terminations.
 

Download File

CAØV/2

09/10/2014

Procedures for Making LV Service Cable Straight Joints.

Download File

EE5/5

09/10/2014

11kV Distribution Transformers.

Download File

SP1N

09/10/2014

Heating, Dehumidification and Ventilation of Switch Rooms and Control Rooms at Grid, Primary and Major Network Substations.
 

Download File

EE7/3

27/08/2014

Switchgear for use on 66kV to 132kV Distribution Systems.
 

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.
 

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.
 

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.
 

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.
 

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.
 

Download File

CA1H/6

27/08/2014

Procedures for Making Low Voltage Mains Cable Disconnecting Boxes.

Download File

EE7/3

27/08/2014

Switchgear for use on 66kV to 132kV Distribution Systems.
 

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.
 

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.
 

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.

Download File

TP21E/1

27/08/2014

Provision of WPD Earth Terminals to Customer LV Installations.

Download File

TP21K/1

08/07/2014

Substation Compound Fence Earthing.
 

Download File

TP21K/1

08/07/2014

Substation Compound Fence Earthing.
 

Download File

TP21K/1

08/07/2014

Substation Compound Fence Earthing.

Download File

TP21K/1

08/07/2014

Substation Compound Fence Earthing.
 

Download File

CA1G/6

08/07/2014

Procedures for Making Low Voltage Mains Cable Terminations.

Download File

TP21L/1

08/07/2014

Fixed Earthing Systems - Construction Techniques - Jointing.

Download File

EE37/1

09/06/2014

Outdoor Meter Cabinets.
 

Download File

OH4P

09/06/2014

Steelwork for Overhead Lines.

Download File

OH4P

09/06/2014

Steelwork for Overhead Lines.
 

Download File

OH4P

09/06/2014

Steelwork for Overhead Lines.
 

Download File

OH4P

09/06/2014

Steelwork for Overhead Lines.

Download File

EE37/1

09/06/2014

Outdoor Meter Cabinets.

Download File

TP21A/2

02/05/2014

Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment.

Download File

TP21A/2

02/05/2014

Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment.
 

Download File

TP21A/2

02/05/2014

Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment.
 

Download File

TP21A/2

02/05/2014

Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment.
 

Download File

NC2D/2

05/03/2014

Specification of Connection Assets.

Download File

NC2D/2

05/03/2014

Specification of Connection Assets.

Download File

NC2D/2

05/03/2014

Specification of Connection Assets.

Download File

NC2D/2

05/03/2014

Specification of Connection Assets.

Download File

NC2D/2

05/03/2014

Specification of Connection Assets.
 

Download File

132kV Connection Guide

05/03/2014

Outline Design Guide for Customers Seeking WPD Adoption of 132kV Switchgear, Associated Equipment, Compound & Control Room.

Download File

EE84/2

05/03/2014

Surge Arresters.
 

Download File

EE84/2

05/03/2014

Surge Arresters.
 

Download File

OH4T/4

05/03/2014

The Design of Single Circuit High Voltage Overhead Lines on Wood Poles at 11kV and 33kV.

Download File

OH4T/4

05/03/2014

The Design of Single Circuit High Voltage Overhead Lines on Wood Poles at 11kV and 33kV.

Download File

EE84/2

05/03/2014

Surge Arresters.

Download File

EE84/2

05/03/2014

Surge Arresters.
 

Download File

TP4B/2

23/01/2014

11kV and 6.6kV Transformer Protection.

Download File

EE72/1

27/12/2013

Specification for Single Core Wet Design of 33kV Medium Voltage EPR Insulated Cables.

Download File

OH4L/1

06/12/2013

Stay Strands and Fittings for Overhead Lines.

Download File

OH4L/1

06/12/2013

Stay Strands and Fittings for Overhead Lines.

Download File

OH4L/1

06/12/2013

Stay Strands and Fittings for Overhead Lines.

Download File

OH4L/1

06/12/2013

Stay Strands and Fittings for Overhead Lines.
 

Download File

WPD G81 Part 6

30/10/2013

Framework for installation and records of industrial and commercial underground connected loads up to and including 11kV.

Download File

OH4K/1

06/09/2013

Design of Insulated Aerial Bundle Conductor For LV Overhead Distribution Systems.

Download File

EE20/4

06/09/2013

Substation Security Fences.
 

Download File

EE20/4

06/09/2013

Substation Security Fences.

Download File

EE20/4

06/09/2013

Substation Security Fences.

Download File

CA1E/4

09/07/2013

Procedures for Making Low Voltage Mains Cable Branch Joints.

Download File

SD5D/2

27/06/2013

Arrangements for LV Cut-Outs.

Download File

SD8A/2

27/06/2013

Revision of Overhead Line Ratings.

Download File

SD8A/2

27/06/2013

Revision of Overhead Line Ratings.

Download File

SD8A/2

27/06/2013

Revision of Overhead Line Ratings.

Download File

SD8A/2

27/06/2013

Revision of Overhead Line Ratings.

Download File

SD8A/2

27/06/2013

Revision of Overhead Line Ratings.
 

Download File

OH4M

08/01/2013

Anti-Climbing Devices for HV Lines Up to and Including 132kV.

Download File

OH4M

08/01/2013

Anti-Climbing Devices for HV Lines Up to and Including 132kV.

Download File

OH4M

08/01/2013

Anti-Climbing Devices for HV Lines Up to and Including 132kV.

Download File

OH4M

08/01/2013

Anti-Climbing Devices for HV Lines Up to and Including 132kV.
 

Download File

EE89/2

08/01/2013

Fixed Earthing Systems for Major Substations.

Download File

EE89/2

08/01/2013

Fixed Earthing Systems for Major Substations.

Download File

EE89/2

08/01/2013

Fixed Earthing Systems for Major Substations.
 

Download File

EE89/2

08/01/2013

Fixed Earthing Systems for Major Substations.

Download File

EE89/2

08/01/2013

Fixed Earthing Systems for Major Substations.
 

Download File

EE89/2

08/01/2013

Fixed Earthing Systems for Major Substations.

Download File

CA1D/4

21/12/2012

Procedures for Making Low Voltage Mains Cable Straight Joints.
 

Download File

MI14D

13/12/2012

Earth Loop Impedance Testing of Services.
 

Download File

CAØB/1

13/12/2012

Procedures for Changing Domestic 100A Cut-Outs with the Incoming LV Service Cale Live.

Download File

WPD G81 Part 1

12/12/2012

Housing Development Design framework.

Download File

CA1AB/1

12/12/2012

Procedures for Making Low Voltage Mains Three Core Wavecon Connection/Disconnection Joints.

Download File

WPD G81 Part 1

12/12/2012

Housing Development Design framework.

Download File

CAØW/1

12/12/2012

Procedures for Changing Street Lighting Cut-Outs with the Incoming LV Service Cable Live.
 

Download File

WPD G81 Part 1

12/12/2012

Housing Development Design framework.
 

Download File

CA1F/3

12/12/2012

Procedures for Making Low Voltage Mains Cable Stop Ends.

Download File

CA1I/4

12/12/2012

Procedures for Making Low Voltage Mains Cable Service Branch Joints.

Download File

CA1U/2

12/12/2012

Jointing of Paper Insulated Concentric and Triple Concentric Mains Cable.
 

Download File

CA1Y/1

12/12/2012

Procedures for Making Low Voltage Mains Cable Loop Joints.

Download File

EE1/6

12/12/2012

Continuous Maximum Rated (CMR) System Transformers for use on systems up to 132kV.

Download File

TP6K/3

12/12/2012

Selection and Assessment of 30V and 110V Substation Battery Systems.

Download File

NC1V/4

12/12/2012

Standard Foundation and Enclosure Details and Specifications for HV Substation Plant.

Download File

WPD G81 Part 1

12/12/2012

Housing Development Design framework.

Download File

TP6K/3

12/12/2012

Selection and Assessment of 30V and 110V Substation Battery Systems.
 

Download File

TP6K/3

12/12/2012

Selection and Assessment of 30V and 110V Substation Battery Systems.
 

Download File

WPD G81 Part 6

12/12/2012

Framework for installation and records of industrial and commercial underground connected loads up to and including 11kV.
 

Download File

EE24/3

12/12/2012

Substation 30V Battery Systems for Protection and/or Circuit Breaker Tripping.
 

Download File

WPD G81 Part 6

12/12/2012

Framework for installation and records of industrial and commercial underground connected loads up to and including 11kV.
 

Download File

SD8B/3 Part 4

11/12/2012

66kV Underground Cable Ratings.

Download File

SD8B/3 Part 5

11/12/2012

132kV Underground Cable Ratings.
 

Download File

SD8B/3 Part 6

11/12/2012

275kV Underground Cable Ratings.
 

Download File

WPD G81 Part 6

11/12/2012

Framework for installation and records of industrial and commercial underground connected loads up to and including 11kV.
 

Download File

SD8B/4 Part 1

11/12/2012

LV Underground Cable Ratings.
 

Download File

WPD G81 Part 6

11/12/2012

Framework for installation and records of industrial and commercial underground connected loads up to and including 11kV.
 

Download File

SD8B/4 Part 2

11/12/2012

11kV Underground Cable Ratings.

Download File

SD8B/3 Part 3

11/12/2012

33kV Underground Cable Ratings.

Download File

Contact us

Emergency information

0800 6783 105

General contact enquiries

0800 096 3080

Innovation team

01332 827449