Information for ICPs

What are you looking for?

Independent Connection Providers (ICPs) can add new connections and make connection alterations, working alongside Western Power Distribution. Please see below for information about this process.

 

Process For A New Entrant

  • Process
  • Framework Network Access and Adoption Agreement
  • Applying for an Extension of Contestability (EOC)
  • DSR Options
  • Access to Technical Information

Find out more


 

Planning the Connection

  • Application Process
  • Network Design
  • Point of Connection
  • How to Apply

Find out more


 

Distribution Safety Rules Authorisation

  • LV Options Table
  • HV Options Table

Find out more


 

Making the Connection

  • Building the downstream asset
  • LV Connection Process
  • HV Connection Process
  • Disconnection of an Existing Metered Connection 

Find out more


 

Inspecting the Adoptable Assets

Find out more


 

WPD Services

  • Inspection Report
  • Issue and Return of Keys
  • Rent a Test Probe
  • LV Cable Identification Service

Find out more


 

Key Contact Details

Find out more


 

Technical Library

We provide extensive information about our legal and consents process on our Technical Information website. We provide this information for use by Independant Connection Providers and Independant Distribution Network Operators. 

Find out more


 

ICP Inspection Reports

A report is now issued to each ICP at the beginning of each month that details the number of inspections that have been undertaken in the previous twelve months on a rolling basis.

Find out more