Skip to main content

Design approval quarterly report

The table below details the time taken (minimum, maximum and average) for responding to requests from Independent Connection Providers (ICPs) for design approval. The number of requests are brown down by market segment.

Market Segment

Design Approved


Design Rejected
 
MinMaxAverageTotalMinMaxAverageTotal


EHV Demand
 

00.00300.000


EHV Generation
 

00.00000.000


HV Demand
 

0102.90891106.5812


HV Generation
 

00.00100.000


LV Demand
 

0103.00105094.9312
 

LV Generation
 

00.00000.000