Design approval quarterly report

The table below details the time taken (minimum, maximum and average) for responding to requests from Independent Connection Providers (ICPs) for design approval. The number of requests are brown down by market segment.

This data represents the period of 1st October 2019 - 31st December 2019.

Market Segment

Design Approved


Design Rejected
 
MinMaxAverageTotalMinMaxAverageTotal


EHV Demand
 

0134.00400.000


EHV Generation
 

0206.3363159.002


HV Demand
 

0104.01810106.2313


HV Generation
 

00.00000.000


LV Demand
 

0103.17590106.007
 

LV Generation
 

00.00000.000