Skip to main content

ICP Inspection Results

The graphs below provide an anonymised view of ICP performance relating to the WPD Inspection and Monitoring regime of adoptable assets and includes inspections undertaken on WPD’s own works within our four licensed areas.

These are updated monthly to display the most recent reportable month and the previous twelve months on a rolling basis.

Key:

 Inspection passed               Inspection failed
 

Inspection results for November 2019 - 100% stacked chart

Inspection results for previous 12 months - 100% stacked chart