Skip to main content

Current Statement of Works responses - Appendix G Information

Where WPD has established an Appendix G relevant generation list through the trial Appendix G process, the summary information in “Part 5” is listed below for the Grid Supply Point.  Please note that we will not currently publish the full Appendix G since individual site specific names and data are listed and we have redacted the Part 5's that are published. 
 
Part 1 contains legacy sites; Part 2 contains more recent sites or future sites where site specific requirements apply to their connection (for example power factor operating requirements); Part 3 contains sites that are subject to interim restrictions (while NGET works take place) and site specific requirements apply; Part 4 contains sites that are unable to connect until works on NGET system are complete.
 
Part 5 (redacted versions of which are published in links below) provides aggregate capacity of sites in Parts 1 to 4. It also provides an indication of any additional capacity that NGET believes may be available (referred to as Materiality Headroom). Allocation of any such capacity is dependant on a monthly submission and approval process under this trial Appendix G approach. There is no guarantee or assurance that capacity included in the Materiality Headroom will be available or that plant will be able to connect using that capacity.
 
In addition a summary of the technical conditions for the Grid Supply Point are provided in the form of reverse power flow limits, fault levels, voltage conditions, or any particular technology limit.
 

East Midlands

WPD-East-Midlands-Appendix-G-Part-5-Summary-Table
WPD-East-Midlands-Site-Specific-Technical-Conditions-Summary-Table

Berkswell-Appendix-G-Site-Descriptive-Requirements
Bicker-Fen-Appendix-G-Site-Descriptive-Requirements
Chesterfield-Appendix-G-Site-Descriptive-Requirements
Coventry-Appendix-G-Site-Descriptive-Requirements
Drakelow-Appendix-G-Site-Descriptive-Requirements
East-Claydon-Appendix-G-Site-Descriptive-Requirements
Enderby-Appendix-G-Site-Descriptive-Requirements
Grendon-Appendix-G-Site-Descriptive-Requirements
Lea-Marston-Appendix-G-Site-Descriptive-Requirements
Ratcliffe-Appendix-G-Site-Descriptive-Requirements
Staythorpe-Appendix-G-Site-Descriptive-Requirements
Stoke-Bardolph-Appendix-G-Site-Descriptive-Requirements
Walpole-Appendix-G-Site-Descriptive-Requirements
West-Burton-Appendix-G-Site-Descriptive-Requirements
Willington-Appendix-G-Site-Descriptive-Requirements

West Midlands

WPD-West-Midlands-Appendix-G-Part-5-Summary-Table
WPD-West-Midlands-Site-Specific-Technical-Conditions-Summary-Table

Bishops-Wood-Appendix-G-Site-Descriptive-Requirements
Bushbury-Appendix-G-Site-Descriptive-Requirements
Bustleholm-Appendix-G-Site-Descriptive-Requirements
Cellarhead-Appendix-G-Site-Descriptive-Requirements
East-Claydon-Appendix-G-Site-Descriptive-Requirements
Feckenham-Appendix-G-Site-Descriptive-Requirements
Iron-Acton-Appendix-G-Site-Descriptive-Requirements
Ironbridge-Appendix-G-Site-Descriptive-Requirements
Kitwell-Appendix-G-Site-Descriptive-Requirements
Lea-Marston-Appendix-G-Site-Descriptive-Requirements
Nechells-East-Appendix-G-Site-Descriptive-Requirements
Ocker-Hill-Appendix-G-Site-Descriptive-Requirements
Oldbury-Appendix-G-Site-Descriptive-Requirements
Penn-Appendix-G-Site-Descriptive-Requirements
Port-Ham-Appendix-G-Site-Descriptive-Requirements
Rugeley-Appendix-G-Site-Descriptive-Requirements
Shrewsbury-Appendix-G-Site-Descriptive-Requirements
Willenhall-Appendix-G-Site-Descriptive-Requirements

South West

WPD South West Appendix G Part 5 Summary Table

Iron Acton Appendix G Site Descriptive Requirements
Seabank Appendix G Site Descriptive Requirements


WPD South West Site Appendix G Connect & Manage Part 5 Summary Table

Abham Appendix G C&M Site Descriptive Requirements
Alverdiscott Appendix G C&M Site Descriptive Requirements
Axminster Appendix G C&M Site Descriptive Requirements
Bridgwater Appendix G C&M Site Descriptive Requirements
Exeter Appendix G C&M Site Descriptive Requirements
Indian Queens Appendix G C&M Site Descriptive Requirements
Landulph Appendix G C&M Site Descriptive Requirements
Taunton Appendix G C&M Site Descriptive Requirements

WPD South West Site Specific Technical Conditions Summary Table


South Wales

WPD-South-Wales-Appendix-G-Part-5-Summary-Table
WPD-South-Wales-Site-Specific-Technical-Conditions-Summary-Table

Aberthaw-Appendix-G-Site-Descriptive-Requirements
Cardiff-East-Appendix-G-Site-Descriptive-Requirements
Grange-66-Appendix-G-Site-Descriptive-Requirements
Pembroke-Appendix-G-Site-Descriptive-Requirements
Pyle-Appendix-G-Site-Descriptive-Requirements
Rassau-Appendix-G-Site-Descriptive-Requirements
Swansea-North-Appendix-G-Site-Descriptive-Requirements
Upperboat-33-Appendix-G-Site-Descriptive-Requirements
Upperboat-132-Appendix-G-Site-Descriptive-Requirements
Uskmouth-132-Appendix-G-Site-Descriptive-Requirements

Please click here to view our Project Progression/Modification Application Submissions table.