Extension of Contestability

A number of Extension of Contestability Agreements (EoC’s) are available to carry out additional works in relation to Competition-in-Connections activities.  The available EoC’s are listed below and, where available, can be selected to view an example agreement:

Self-Approval of Design

In some instances, ICP's and IDNO's can determine their own Point of Connection (POC) in place of applying to WPD for a POC.

The table below identifies the Market Segments within which the ICP/IDNO can determine their own Point of Connection:

Market Segment

Self Determination Available
(Yes/No)

Comment

LV demandYMatrix available
HV demandY 
HVEHV demand 
EHV132 demand 
DG LV 
DGHVEHV 
UMS LAY 
UMS OtherY 
UMS PFIY 

The following criteria determines when a Point of Connection can be determined through the Standard Design Matrix utilising the common template:

Criteria

Measurement

Comment

Connection capacity200kVA maximumReduced to 150kVA maximum for 6.6kV networks
Distance to substation 200mIncreased to 250m for capacity less than 150kVA
Service cable length30m 
Transformer Capacity315kVA and aboveRestriction on total load on single LV fuse way
Asset types excludedNone 

In some instances, ICPs and IDNO's can self approve their own design, subject to the qualifying criteria to reach self inspection level. The table below indicates the Market Segments within which the ICP/IDNO can self approve their designs:

Market Segment

Self Approval Available
(Yes/No)

Comment

LV demandY 
HV demandY 
HVEHV demand 
EHV132 demand 
DG LV 
DG HVEHV 
UMS LAY 
UMS OtherY 
UMS PFIY 

An audit process is in place to ensure that designs are compliant with WPD policies and standard techniques.

The table below identifies the qualifying criteria that will apply to allow an ICP/IDNO to move between the different levels of design approval:

Level

Criteria

1100% Audit, 20 audits to move to level 2
250% Audit, 20 audits to move to level 3
325% Audit
Self-audit level 15% Audit, 20 audits to move to self-audit level 2
Self-audit level 22% Audits

Further details on self-determination of a point of connection and design self-approval can be found within the standard techniques which can be accessed via the Technical Information page.  

To enter into any of these agreements with us, or if you have any questions, please contact the connection policy team at wpdconnectionpolmids@westernpower.co.uk.