Skip to main content

ICP Operations

Please use the categories below to help you find the correct information:

Unmetered
Streetlighting
Low Voltage
11,000 Volt
33,000 Volt
66,000 Volt
​132,000 Volt

NC2L/8

19/04/2018

Independent Connection Provider (ICP) High and Low Voltage Connections under ICP or WPD DSRs.
 

Download File

NC2G/3

23/05/2016

Network Access and Adoption Agreements.
 

Download File

NC2L/8

19/04/2018

Independent Connection Provider (ICP) High and Low Voltage Connections under ICP or WPD DSRs.
 

Download File

NC2G/3

23/05/2016

Network Access and Adoption Agreements.
 

Download File

NC2L/8

19/04/2018

Independent Connection Provider (ICP) High and Low Voltage Connections under ICP or WPD DSRs.

Download File

NC2G/3

23/05/2016

Network Access and Adoption Agreements.

Download File

OS7H/1

31/08/2017

Due diligence checks on ICP safety management systems and ICP operational site performance as well as operational induction briefings and tests for non WPD Authorised SAP(s).
 

Download File

Distribution Safety Rules

23/12/2016

Distribution Safety Rule.

Download File

NC2F/4

28/03/2018

Design Approval.
 

Download File

OC1A/5

07/04/2016

High Voltage System Control and Switching.

Download File

OC1K

07/04/2016

Transfer of Control of WPD Network between WPD Central Control and ICP Control.
 

Download File

OC3C/2

07/04/2016

The Identification and Proving Dead of Plant and Apparatus.

Download File

OS4A/2

08/04/2016

The Location, Identification and Proving Dead of Underground Cables.
 

Download File

OS4B

08/04/2016

Identification and Proving Dead of Overhead Lines.
 

Download File

NC2L/8

19/04/2018

Independent Connection Provider (ICP) High and Low Voltage Connections under ICP or WPD DSRs.

Download File

NC2G/3

23/05/2016

Network Access and Adoption Agreements.
 

Download File

OC1L/1

19/04/2018

Operational Procedure for Independent Connection Providers carrying out HV Connection Works under Option 4 of the ICP Self Connect Process.
 

Download File

OS7H/1

31/08/2017

Due diligence checks on ICP safety management systems and ICP operational site performance as well as operational induction briefings and tests for non WPD Authorised SAP(s).
 

Download File

Distribution Safety Rules

23/12/2016

Distribution Safety Rule.
 

Download File

NC2F/4

28/03/2018

Design Approval.

Download File

OC1A/5

07/04/2016

High Voltage System Control and Switching.
 

Download File

OC1K

07/04/2016

Transfer of Control of WPD Network between WPD Central Control and ICP Control.
 

Download File

OC3C/2

07/04/2016

The Identification and Proving Dead of Plant and Apparatus.
 

Download File

OS4A/2

08/04/2016

The Location, Identification and Proving Dead of Underground Cables.
 

Download File

OS4B

08/04/2016

Identification and Proving Dead of Overhead Lines.

Download File

NC2G/3

23/05/2016

Network Access and Adoption Agreements.
 

Download File

Distribution Safety Rules

23/12/2016

Distribution Safety Rule.
 

Download File

NC2F/4

28/03/2018

Design Approval.
 

Download File

OC1A/5

07/04/2016

High Voltage System Control and Switching.

Download File

OC1K

07/04/2016

Transfer of Control of WPD Network between WPD Central Control and ICP Control.
 

Download File

OC3C/2

07/04/2016

The Identification and Proving Dead of Plant and Apparatus.
 

Download File

OS4A/2

08/04/2016

The Location, Identification and Proving Dead of Underground Cables.

Download File

OS4B

08/04/2016

Identification and Proving Dead of Overhead Lines.
 

Download File

NC2G/3

23/05/2016

Network Access and Adoption Agreements.
 

Download File

Distribution Safety Rules

23/12/2016

Distribution Safety Rule.

Download File

NC2F/4

28/03/2018

Design Approval.
 

Download File

OC1A/5

07/04/2016

High Voltage System Control and Switching.

Download File

OC1K

07/04/2016

Transfer of Control of WPD Network between WPD Central Control and ICP Control.

Download File

OC3C/2

07/04/2016

The Identification and Proving Dead of Plant and Apparatus.
 

Download File

OS4A/2

08/04/2016

The Location, Identification and Proving Dead of Underground Cables.
 

Download File

OS4B

08/04/2016

Identification and Proving Dead of Overhead Lines.
 

Download File

NC2G/3

23/05/2016

Network Access and Adoption Agreements.

Download File

Distribution Safety Rules

23/12/2016

Distribution Safety Rule.
 

Download File