The following table provides an overview of Appendix G details for this GSP.

Part 1 contains legacy sites. Part 2 contains more recent sites or future sites where site specific requirements apply to their connection (for example power factor operating requirements). Part 3 contains sites that are subject to interim restrictions (while NGESO works take place) and site specific requirements apply. Part 4 contains sites that are unable to connect until works on NGESO system are complete. Part 5 provides an indication of any additional capacity that NGESO believes may be available (referred to as Materiality Headroom). Allocation of any such capacity is dependent on a monthly submission and approval process under this trial Appendix G approach.

Appendix G headroom: There is no guarantee or assurance that capacity included in the Headroom will be available or that plant will be able to connect using that capacity. For example, Materiality Headroom and Fault Level Headroom can be utilised shortly after it is published on our website due to an acceptance of a connection offer, which will be captured in Appendix G submission to NGESO in the following month.

In addition a summary of the technical conditions for the Grid Supply Point are provided in the form of reverse power flow limits, fault levels, voltage conditions, or any particular technology limit.

PropertyValue
Licence AreaSouth Wales
GSPSwansea North
Part 1 [MW]438.7
Part 2 [MW]758.1
Part 3 [MW]0.0
Part 4 [MW]49.9
Part 5 [MW]0.0
Total Aggregated Developer Capacity [MW]1246.1
Fault Level Headroom [kA]0.2
Connection Asset Reverse Power Limits [MVA]480
Approved Copy of Appendix G16/02/24
Last Reviewed19/04/24
Subject to Project ProgressionYes
Capacity in Project Progression315.65
Power Factor RangeYes
Emergency DisconnectionYes
SGT ANMYes
Technology RestrictionBESS subject to Project Progression/Modification Application
Materiality Headroom Subject to Completion of Transmission WorksN/A

Power Factor Range

In order to allow NGED to contain voltage within acceptable limits at the National Electricity Transmission System (NETS)/ Distribution System interface, the Customer must ensure that the generators (≥1MW) have the capability to operate between 0.95 leading and 0.95 lagging power factor. Customers will be advised of the target Power Factor within this range.

Emergency Disconnection

National Grid Electricity Transmission (NGET) has instructed that NGED shall maintain a facility such that under emergency conditions on the National Electricity Transmission System (NETS), NGED shall have the ability to de-energise embedded generation (≥1MW) upon instruction from NGET.

SGT ANM

The Customer’s generation will be included in the SGT Active Network Management Scheme (ANM) .The SGT ANM will automatically curtail the output of the Customer’s generation in order to control power flow in reverse direction through the Supergrid Transformers (SGTs) at this Grid Supply Point